Stand Pipe Installation



Road to landing during summer 2002 before restoration work. Road during fall, 2002 before restoration work, heavy rains flood over beaver dam and across access road.

To allow us to carry out restoration on the landing site at Laughlin Lake, and to allow us restrict vehicle access from the lake side, we had to install a standpipe that would give the fire department emergency access to water without needing to drive through the creek to get it. Large alder saplings were salvaged by the excavator for later replanting. A defined stream channel was excavated where the water from Laughlin Lake used to cross the old road. Large rocks were placed as landings for the footbridge that was later installed.

 

Photos of the stand pipe installation.

 

Photos of the road during the first winter after restoration work, pre-bridge installation.

 

2005 after footbridge installation Summer 2006

Donate Now
Become a member
Volunteering

Galiano Restorative Learning Centre Info
In the News
Thank you Supporters

Shaw T.V. joins our Education Program
Shaw T.V. joins our Education Program at the Beach

Let it Rot
Let It Rot: A six-minute film featuring our awesome Forest Restoration Project.

Take a virtual stroll down our forest restoration trail